At the drilling site of the lead-zinc mining area in jinyang.Sichuan Province 19 boreholes were successfully drilled on the cliffs under the condition of on road,weit a total length of 4200 meters,a single hole of the deepest 506 meters,an average piatform of 40 meters,and an average full hole adoption rate of 92%.